The "Highway Daishi Bridge" on the Metropolitan Expressway connecting Tokyo and Kanagawa has been closed for two weeks due to bridge replacement work due to aging. The bridge will be replaced by the 9th, and the two-week road closure will be lifted at 2 a.m.

on the 10th. The weight of the bridge is about 29,4000 tons, which is comparable to that of Tokyo Tower, and there is no previous example of a bridge of this scale being replaced.